Bridgeville DE
Email: wayne@faircloth.org
Bridgeville DE
The original post for picture(s) done on 2008-09-23 by E.W. Faircloth can be found at
https://faircloth.org/blog1/?p=984
Tags: I see it this way!
Work on a bypass road which is to make for a safer intersection is taking forever, or it seems. I think the main reason it is taking so long could be no one works a 5 day week on project. The picture was taken on a normal work day. It was not the weekend or a holiday.